2 pt adjust powder comp – DeFelsko PosiTector PC v.1.1 User Manual

Page 10

Advertising
background image

9

1. Zero the probe (pg. 6).
2. Electrostatically spray powder onto 2 flat, smooth metal samples.

Place approximately 40 microns (1.5 mils) on one and 75 microns
(3 mils) on the other.

3. Open a New CAL setting (optional - pg. 10).
4. Select New Batch (pg. 11)
5. Take at least 3 uncured powder measurements on the thin powder

panel with the PosiTector PC. Results will be stored in the Batch.

6. Open a second new Batch.
7. Take at least 3 uncured powder measurements on the thick powder

panel with the PosiTector PC. Results will be stored in the
second Batch.

8. Cure the powder on both panels.
9. Measure cured thickness with a magnetic or eddy current coating

thickness gage. Record the results.

10. Select "2 Pt Adjust" then select the appropriate batch names

when asked.

11. Adjust the displayed batch averages lower (-) or higher (+) to match

the cured thickness values.

1. Zero the probe (pg. 6).
2. Electrostatically spray a thick layer of powder (135 microns / 5 mils)

onto a flat, smooth metal sample. Lay the panel on a table surface.

3. Place the included Powder Probe Fixture onto the coated panel.
4. Place the measuring end of the probe into the Fixture.
5. On the base unit select the "Powder Comp" menu option. This can

take up to 30 seconds.

6. A 1- or 2-point adjustment may be required after this operation.

2 Pt Adjust

Powder Comp

Note: The symbol on the display will turn off after
the successful completion of an adjustment.

Advertising