Instrument Installation

Site Requirements

To install and operate the ANKOM

2000

Fiber Analyzer you will need the following:

Adjustable wrench

Water supply located close to the ANKOM

2000

capable of heating water to 50°C for Crude Fiber and

70°C for ADF/NDF analyses

Adequate power (see “Operating Environment” section)

Drain

Instrument Installation Procedure

To install the ANKOM

2000

Fiber Analyzer, follow the procedure detailed below.

1.

Remove the instrument from the shipping container and place it in an area that is within six feet of a
drain and water supply on a surface that is firm and level. The instrument must not be subject to
excessive shock, vibration, dirt, moisture, oil, or other fluids.

IMPORTANT

Do NOT place this instrument near microwave ovens or mechanical devices.

Your instrument comes complete with a Power Cord, a Drain Hose, a Vent Tube, a Bag Suspender
Assembly (including Bag Suspender Trays and a Bag Suspender Weight), and an Amylase Container.

2.

With the Power Switch in the OFF position, plug the Power Cord into the Power Cord Inlet.

3.

Plug the Power Cord into the power source.

4.

Install the Water Filter assembly. Attach ¼” copper tubing to the hot water source (+50°C Crude Fiber,
+70°C ND and AD) and to the Water Supply Fitting located on the left side of the instrument.

5.

Connect and secure the Drain Hose so that it will not move when hot pressurized fluid is exhausted.