Important, Operator’s manual – ANKOM 2000 Series User Manual

Page 12

Advertising
background image

Operator’s Manual


pg. 12

Rev E 1/14/15

6.

If you are using Cubetainers for your chemicals, install the Cubetainer Shelf shown below (Optional).

IMPORTANT

The solutions are gravity fed into the instrument ports. The bottom of the solution level
must be at least 5” (13cm) above the port. The top of the solution level can be no more
than 20” (50cm) above either port or the solution will overflow into the drain.

Advertising