1 confirming initial operations – FUJITSU MCJ3230AP User Manual

Page 70

Advertising
background image

Installation Requirements

3-22

C156-E205-01EN

1)

Make sure that the system power is off.

2) Do not connect or disconnect any cable when the power is on.

1)

Connect the DC ground cable (only if required to decrease ground noise).

2)

Connect the power cables.

3)

Connect the AT interface cable.

4)

After each cable connector is connected, secure the cable so that the cable
does not touch the drive or the parts on the PCA or obstruct the flow of
cooling air in the system cabinet.

3.9 Operation Confirmation and Preparation for Use after

Installation

3.9.1 Confirming initial operations

This section provides the operation check procedures after the power is turned on.

(1) Initial operation when the power is turned on

"

When the power is turned on, the drive starts initial self-diagnosis. The LED
on the front panel is on for 1 second during initial self-diagnosis.

"

If an error is detected during initial self-diagnosis, the LED on the front panel
blinks.

"

In case of not inserted the cartridge, when the power is turned on, the eject
motor automatically turns once.

(2) Checks if errors occur at initial self-diagnosis

"

Make sure that the cables are connected correctly.

"

Make sure that the supply voltage is correct. (Measure the voltage at the
power supply connector of the optical drive.)

"

Make sure that the settings of all terminals are correct.

"

If the LED on the front panel blinks continuously, an error was detected
during initial self-diagnosis. In this case, issue the REQUEST SENSE
command from the initiator (host system) to obtain sense data for error
analysis.

Advertising