3 junction box – Furuno FA-100 User Manual

Page 16

Advertising
background image

10

1.3 Junction

Box

Mount the junction box where the junction box is protected from rain and water
splash.

Mounting

1. Open the lid of the junction box and fix the junction box with four tapping screws

(5x20). Avoid bundling the 3.3 m cable of the junction box together with any
power cable. This causes malfunction.

2. Connect cables to the terminal board, referring to Chapter 2 and 3.
3. Fix the lid after connecting external equipment.
4. Clamp the cable with several U-type cable clamps (local supply) at suitable

intervals.

Fixing holes
(5x20 tapping screws)

Cable entry

Cable clamp

Clamp the cable with
U-type cable clamps.

Advertising