120 operating manual, Hot-plug components – FUJITSU BX900 S1 User Manual

Page 120

Advertising
background image

120

Operating Manual

BX900 S1

Hot-plug components

©

c

o

gn

itas

. G

es

el

ls

ch

ft f

ür

T

ec

h

ni

k-

Do

ku

m

en

tat

io

n

m

bH

2

01

1

P

fa

d:

C

:\P

rogr

am

m

e

\F

CT

\t

im

_ap

p\

tim

_l

oc

al

\w

ork

\W

A

LT

E

R

\O

B

J_

DO

K

U

-4

95

3-0

07

.fm

With the mezzanine cards, the assignment of the ports to the connection blade
slots can be defined via the management blade. The following figure shows the
different options.

For more information on configuring the connection blades, see the manual
"PRIMERGY BX900 Blade Server Systems ServerView Management Blade S1
User Interface Description" and the documentation for the relevant connection
blades.

mezzanine card

Mezzanine card slot (M)

Connection blade slot (CB)

Port (P)

Port (P)

FC 8Gb/s

M1.P0

CB3

M1.P1

CB4

M2.P0

CB5

M2.P1

CB6

LAN 1GbE

M1.P1 / M1.P3

CB3.P1 / CB3.P2

M1.P2 / M1.P4

CB4.P1 / CB4.P2

M2.P1 / M2.P3

CB7.P1 / CB7.P2

M2.P2 / M2.P4

CB8.P1 / CB8.P2

LAN 1GbE

M2.P1 / M2.P3

CB5.P1 / CB5.P2

Option 2

M2.P2 / M2.P4

CB6.P1 / CB6.P2

LAN 1GbE

M2.P1 / M2.P3

CB5.P1 / CB7.P2

Option 3

M2.P2 / M2.P4

CB6.P1 / CB8.P2

LAN 10GbE / 10Gb CNA

M1.P1

CB3.P1

M1.P2

CB4.P1

M2.P1

CB5.P1

M2.P2

CB6.P1

Infiniband

M1.P1

---

M1.P2

CB3/CB4

M2.P1

CB7/CB8

M2.P2

CB5/CB6

SAS 6Gb

M2.P1

CB5.P1

M2.P2

CB6.P1

Table 4: Port assignment of connection blades and mezzanine cards

Advertising