Warning, Chimney, Blocked vent safety switch – GSW JWF307 User Manual

Page 8: Installation, Power venting, Installation of power venter, Burner installation general

Advertising
background image

– 8 –

Chimney

Be sure that the chimney is sufficiently high and large

enough to meet the specifications of the burner unit

installed. Check that there is sufficient draft for the proper

burning of oil. At least -0.015 in. (-0.381mm) water column

of over-fire draft is recommended.

Blocked Vent Safety Switch

Oil-fired water heaters installed in Canada must be fitted

with the blocked vent safety switch supplied with your

heater. The installation procedure is given below. For further

details and information refer to the instruction sheet supplied

with the switch. (Not required for JWF307V.)

Installation

1. Pierce a 16mm (5/8 in.) dia. hole into the flue pipe

305mm to 457mm (12 to 18 in.) from the breech con-

nection of the water heater. Remove one of the securing

nuts from the pipe of the safety switch. Tighten the other

securing nut onto the pipe as far as possible.

2. Insert the threaded pipe end into the pierced hole, then

install the securing nut, which was removed in step 1,

and tighten securely.

CAUTION:

: Turn "OFF" the electrical supply to the water

heater when wiring safety switch.

3. Wire the safety switch in series with L1 of the electrical

supply (see Figures 9, 10 & 11). Install and route wiring

in an accordance with “Canadian Electrical Code Part

1 (C22.1)” and any applicable local codes.

CAUTION:

If for any reason the system has shut down dur-

ing operation, the cause of the system failure should be

investigated and corrected before resetting the safety switch

and re-starting the system.

Power Venting

Models JWF307, JWF507 and JWF657 may be power vent-

ed with a Field SWGII 4HD Power Venter. The following con-

trol kits may be used with the SWGII 4HD:

CK 61 Electronic Post Purge.

CK 62 Thermally Activated Post Purge.

Installation of Power Venter

The “Installation Code for Oil-Burning Equipment (CSA

B139-04)” or “Standard for the Installation of Oil-

Burning Equipment (NFPA 31)”, local codes and the man-

ufactures instructions should be adhered to in all installa-

tions of the water heaters and power venters. A draft regula-

tor must be used in conjunction with the installation of the

power venter (see “Draft Regulator”). Consult the applicable

codes to calculate total equivalent vent pipe length, the

straight runs of pipe and the equivalent length of pipe for

each fitting.

Burner Installation
General

The installation of these units shall be in accordance with

the “Installation Code for Oil-Burning Equipment (CSA

B139-04)” or “Standard for the Installation of Oil-

CK SERIES

CONTROL KIT

DRAFT

REGULATOR

OIL FIRED

WATER

HEATER

SWG II 4HD

POWER

VENTER

Figure 6 POWER VENTING

BEND DOWN

WHEN MODEL JWF307 IS TO BE FIRED AT

THE MAXIMUM RECOMMENDED RATE OF

0.75 GPH, THE FLUE BAFFLE MUST BE

ALTERED AS IN THE DIAGRAM. BOTH HALF

DISCS MUST BE BENT FLAT AGAINST THE

BODY OF THE BAFFLE.

THIS IS REQUIRED TO ALLOW FLUE GAS

PASSAGE AT THE HIGHER FIRING RATE.

Figure 5 BAFFLE MODIFICATION (JWF307)

This installation must be performed by a

qualified Oil-Burner Technician in accor-

dance with these instructions and diagrams.

The installation and maintenance of the

water heater must follow all of the instruc-

tions in preceding sections of this manual.

Improper installation can cause injury or

property damage. Heater failure that is a

result of the heating system is not covered

by warranty.

WARNING

SEE MANUFACTURER’S

INSTRUCTIONS

Advertising
This manual is related to the following products: