2 control execution command – Yokogawa DA100 User Manual
Page 62

IM DA100-11E
6-10
p4
Storage selection (ABORT, STORE)
Example
Store the calibrated values for the module in slot
1 of subunit 0.
XZ0, 1, END, STORE
Comments
• Connection
DC Voltage Measurement : Input a DC voltage
according to the measurement range to CH3.
CH2 is short-circuit.
Temperature Measurement using RTD : Input
100
Ω
to CH5. CH4 is short-circuit.
• Caribrate the high sensitive RTD after
calibrating of 60mV and 200mV ranges.
• Be sure to execute STORE using A/D
calibration end processing every time an A/D
calibration/adjustment for one module is
completed. If A/D calibration end processing
(STORE) is not executed, the calibrated data
are ineffective.
• Since it takes an indefinite time to execute an
XZ command, return an ACK after the
processing is over.
On the controller side, execute the following
processing after receiving the ACK after
transmitting an XE command. The ACK status
format is as follows:
E0Cr+Lf: The received command has been
normally processed.
E1Cr+Lf: There is an error in the received
command.
6.2
Control Execution
Command
AR
Executes an alarm reset.
Mode
Operation mode
Setting
ARp1<terminator>
p1
0, Execute the alarm reset.
Example
Execute the alarm reset.
AR0
IR
Executes an alarm reset.
Mode
Operation mode
Setting
IRp1<terminator>
p1
0, Execute the timer reset.
Example
Execute the timer reset.
IR0
EX
Computation start/stop, restart of
computed data after they are cleared,
and release of statuses after
completing measurement
Mode
Operation mode
Setting
EXp1<terminator>
p1
Computation start/stop, restart of
computed data after they are cleared, and
execution of releasing statuses after
completing measurement.
0: Computation start
1: Computation stop
2: Restart of computed data after they are
cleared
3: Computed data clear
4: Release of statuses after completing
measurement
Example
Start the computation.
EX0
Comments
• This command only works with the optional
computation function or if a pluse module is
installed.
• If MATH is set for level action in the event/
action, a computation start/stop/start after
clearing the computed data cannot be done
using the EX command
BL
Executes the initial balancing of the
strain input channel
Mode
Operation mode
Setting
BLp1, p2, p3<terminator>
p1
The first channel for executing the initial
balancing
p2
The last channel for executing the initial
balancing
p3
Select either initial balancing or
initialization
EXEC: Execute initial balancing
INIT: Execute initialization
Example
Execute initial balancing on subunit 0 and
channels 01 to 08.
BL001, 008, EXEC
Comments
• Channels other than strain input channels or
channels that are not connected within the
specified range are ignored.
• Initial balancing and initialization can not be
executed during a report.
6.2 Control Execution Command