Hardware installation, Precautions, Requirements – Brocade Mobility 7131N-FGR Access Point Installation Guide (Supporting software release 4.0.0.0-035GRN and later) User Manual

Page 13: 2 hardware installation, Precautions requirements

Advertising
background image

Brocade Mobility 7131N-FGR Access Point Installation Guide

5

53-1001948-01

Chapter

2

Hardware Installation

Brocade Mobility 7131N-FGR Access Point installation includes mounting the
access point, connecting the access point to the network, connecting antennae and
applying power. Installation procedures vary for different environments.

The Brocade Mobility 7131N-FGR Access Point has the following port designations:

GE1/POE - LAN port

GE2 - WAN Port

Precautions

Before installing the Brocade Mobility 7131N-FGR Access Point, verify the following:

Do not install in wet or dusty areas without additional protection. Contact a
Brocade representative for more information.

Verify the environment has a continuous temperature range between -20° C to
50° C.

Requirements

The minimum installation requirements for a single-cell, peer-to-peer network:

A Brocade Mobility 7131N-FGR Access Point (in either of its two available
dual-radio models)

48 Volt Power Supply (50-14000-247R)

A power outlet

Dual-band antennae or an antenna specifically supporting the AP’s 2.4 or 5
GHz band

AP7131N_InstallationGuide.book Page 5 Tuesday, August 24, 2010 5:09 AM