Crystal nVision Lab Reference User Manual

Page 3

Advertising
background image

2

Click the

Setup Wizard

button.

3

Install your Red and Black test leads into the Switch Test locations

as shown in the wizard. Ensure that the leads are not connected

together forming a closed circuit.

4

Press

Start

. The application will survey the circuit in the open state.

5

When prompted by “Waiting for switch to close…,” connect the red

and black test leads together creating a closed circuit.

The application will survey the circuit in the closed state.

6

Select

Finished

.

7

Update your Gauge by selecting the

Update Gauge

button.

Your nVision with MA20 is fully functional and ready to use.

Advertising
This manual is related to the following products: