Crystal nVision Lab Reference User Manual
Page 3
Advertising
2
Click the
Setup Wizard
button.
3
Install your Red and Black test leads into the Switch Test locations
as shown in the wizard. Ensure that the leads are not connected
together forming a closed circuit.
4
Press
Start
. The application will survey the circuit in the open state.
5
When prompted by “Waiting for switch to close…,” connect the red
and black test leads together creating a closed circuit.
The application will survey the circuit in the closed state.
6
Select
Finished
.
7
Update your Gauge by selecting the
Update Gauge
button.
Your nVision with MA20 is fully functional and ready to use.
Advertising
This manual is related to the following products: