Installation instructions, Cut holes, For recessed-bottom cabinets only – GE JV536HSS User Manual
Page 14: Run wires, Screw in partway, Feed in wires, Secure hood
14
Installation Instructions
CUT HOLES
Cut holes at marked locations for duct and electrical
wiring. For the vertical duct, cut out 3/4”H[WUDWRZDUG
the front of the cabinet so you can move the duct
freely when installing the hood. It may also ease
installation by cutting the hole 10
1
ø
2
” instead of 10”.
FOR RECESSED-BOTTOM CABINETS
ONLY
RUN WIRES
Run the electrical wires through the wall or
cabinet according to National Electrical Code
and applicable local codes.
NOTE: DO NOT turn the power on until installation is
complete.
12
11
13
SCREW IN PARTWAY
Drive a mounting screw (from the hardware packet)
partway into each center of the narrow neck of the
keyhole slots marked on the cabinet bottom.
FEED IN WIRES
Lift the hood into position and feed the house
wiring through the wiring knockout.
14
15
Wood shims
• If the cabinets have front, side or back trim, make
2 wood shims the width of the trim and attach them to
the cabinet bottom recess on both sides. See Step 9 for
marking locations.
SECURE HOOD
Slide the hood back against the wall. Tighten the
mounting screws. Be sure the screw heads are in
the narrow neck of the keyhole slot.
Keyhole (4)
Mounting
screw (4)
16