SNAP-LOC 24

INSTALLATION OF RAKE FLASHING

(CONT.)

5. Position the top part to the SSR Rake flashing so that it rests on the wall panel and the SSR Rake

Cleat. Adjust the SSR Rake flashing until the top part is level. Fasten the SSR Sculptured Rake
flashing to the SSR Rake Cleat using #

1

/

4

-14 x

7

/

8

" Stitch XL screws. Fasten every 12" O.C.

4. If Snap-Loc Sculptured Gutter is to be installed, start the SSR Sculptured Rake flashing at the

eave by placing the rake flashing 8" past the eave end of the panel. If Snap-Loc Sculptured Eave
is to be installed, start the rake flashing at the eave 4" past the eave end of the panel. For installing
flashings other than sculptured flashings consult Metal Sales.

2"

1

/

4

-14 x

7

/

8

"

STITCH XL

SSR SCULPTURED RAKE (OFF MODULE)

6. If two or more SSR Sculptured Rake flashings are required, working from eave to peak of building,

lap rake flashing over previously installed flashing by a minimum of 2" placing Double Bead Tape
Sealant between the flashings along the edge where they lap. Fasten at lap with eight (8)

#1

/

4

-14 x

7

/

8

" Stitch XL screws or

1

/

8

" Pop Rivets as shown.

1

/

8

" Pop Rivet

DOUBLE BEAD TAPE SEALANT

GUTTER DRIP

8"

12"