PAGE 42 — DCA-400SSK — PARTS AND OPERATION MANUAL (STD)— REV. #3 (09/17/01)

General Inspection Prior to Operation

The DCA-400SSK generator has been thoroughly inspected
and accepted prior to shipment from the factory. However,
be sure to check for damaged parts or components, or loose
nuts and bolts, which could have occurred in transit.

Extension Cable

When electric power is to be provided to various tools or
loads at some distance from the generator, extension
cords are normally used. Cables should be sized to allow
for distance in length and amperage so that the voltage
drop between the generator and point of use (load) is held
to a minimum. Use the Cable Selection Guide (Table 10)
as a guide for selecting proper cable size.

Circuit Breakers

To protect the generator from an overload, a 3-pole,1000
amp, main

main

main

main

main circuit breaker is provided to protect the UVW

output terminals from overload. In addition two single-pole,
20 amp GFCI

GFCI

GFCI

GFCI

GFCI circuit breakers are provided to protect the

GFCI receptacles from overload. Three 50 amp load

load

load

load

load circuit

breakers have also been provided to protect the load side of
the generator from overload. Make sure to switch ALL

ALL

ALL

ALL

ALL circuit

breakers to the "OFF" position prior to starting the engine.

DCA-400SSK — PRE-SETUP

ALWAYS consult with a licensed
electrician for correct extension
cord wire size.