Dl20 configuration, Connecting epi str-link recorders, Operating procedures – Rockwell Automation 2706 DL20 SERIES G USER MANUAL User Manual
Page 137: Make sure that the dl20 is set for: baud rate, Parity

Appendix B
Tape Recorder Setup
B–11
DL20 Configuration
Make sure that the DL20 is set for:
Baud Rate =
1200
Parity =
None
Connecting EPI STR-LINK Recorders
Figure B.5 illustrates the connections. Connect the STR-LINK Recorder
(DATA SET INTERFACE connector) to the DL20 RS-232 port using the
Tape Loader Cable (Catalog No. 2706-NC3) as shown.
If you are using a keyboard (Catalog No. 2706-NK1 or -NK2), plug the
keyboard into the rear of the DL20. No other connections are required.
If you are using an Allen-Bradley Industrial Terminal (T1 through T4), use
cable (Catalog No. 2706-NC5). This cable connects to the DATA
TERMINAL INTERFACE connector on the data recorder and Port B on the
industrial terminal.
If you are using another type of dumb terminal, you must construct your own
cable.
Figure B.5
EPI STR-LINK Data Recorder
RS
232
OUT
6
7
8
RS
232
IN
GND
EPI STR-LINK RECORDER
DL20 DISPLAY
2706-NC3
Tape Loader Cable
MAIN
DUMB TERMINAL
User Supplied Cable
Operating Procedures
The DL20 prompts you through the procedure. If necessary, refer to the
previous Allen-Bradley Data Recorder procedures for examples.