3.3

Start Up Procedure.

Check that all piping and associated equipment are clean and free from debris and

that all pipe connections are secure and leak free.

For pumps installed with flushed product seals check that all auxiliary services are in

place and connected and provide sufficient flow and pressure for flushing purposes.

If an external relief valve is incorporated in the system check that it is set correctly.

For start up purposes it is considered good practice to set the relief valve lower than

the system design pressure. On completion of start up the relief valve should be

reset to the required setting for the application. The required setting should never

exceed the lower of either the pumps maximum pressure rating or the system design

pressure.

Ensure both suction and discharge valves are fully open, and pipework is free from

all obstructions. Acculobe pumps are of the positive displacement type and should

therefore never be operated against a closed valve as this would result in pressure

overload, resulting in damage to the pump and possibly the system.

Ensure product is available in the tank before starting pump. This is very important

for pumps installed with unflushed product seals, as these sealing arrangements

must never be allowed to run dry.

Before beginning operation it is considered good practice to momentarily start/stop

the pump to check the direction of rotation and ensure that the pump is free of

obstructions. Once this has been carried out, begin operation keeping a visual check

on suction and discharge pressure gauges and monitor pump temperature and

power absorbed where possible.

Note: For motor flange mounted Acculobe pumps the ‘driven’ rotor is on the right

hand side when looking from the front cover and the name plate is in the top position.

The driven rotor rotates in the same direction as the motor shaft.

3.4

Shutdown Procedure.

When shutting the pump down close both the suction and discharge valves and

ensure that the necessary safety precautions are taken:

The prime mover power source has been isolated.

If Installed, flushed product seal auxiliary services have been isolated and

depressurized.

Pump head and piping have been drained and purged.