Assembly: pump gasket table – Viking Pump TSM845: K-KK 825, 823, 827 User Manual

Page 9

Advertising
background image

SECTION TSM 845

ISSUE

F

PAGE 9 OF 14

Use a suitable lubricant compatible with the fluid being

handled when reassembling the pump
Inspect all parts, especially drilled holes in casing for the suck

back system to make sure they are not plugged Replace any

worn parts and polish any burrs; clean all parts; assemble

pump
1. If the canister O-rings need to be replaced, apply a

lubricant to the O-ring and place into the O-ring groove

If the O-ring is PTFE (derivative) encapsulated, follow

these special instructions

Do not attempt to reuse the primary O-ring if it has been

removed (and is PTFE derivative encapsulated) Immerse a

new O-ring in boiling water and stretch out O-ring so it will

fit onto casing hub without forcing over a sharp edge Run

hot water over O-ring until it shrinks down tight onto the pilot

of the pump Dry with compressed air The secondary PTFE

derivative encapsulated O-ring can be placed in the bracket

groove with some lubricant
2. If casing was removed from bracket, inspect flat

gasket and replace if necessary. Install casing onto

bracket pilot in the same orientation as before. This

series of pumps does not allow rotating the casing

to alternate port configurations – to modify the port

arrangement, Refer to “Pump Rotation” on page 10.

Secure the casing with (8) capscrews

3. Place the balance plate (if separate from bracket) into

the casing bore (this step may not be required in the

825 series) Make sure plate is positioned the same as

before

Refer to Figure 15 for standard balance plate

positioning

ASSEMBLY: PUMP

GASKET TABLE

FIGURE 15

PUMP MODEL

NORMAL END

CLEARANCE

(iNCH )

SET OF GASKETS

CONSISTS OF THE

FOLLOWING

K & KK 825

008

(1) 015

(2) 007

(3) 005

K & KK 823, 827

010

TABLE 2

As a general guideline, for viscosity’s between 750 and

7500 SSU (heavier lube oils) double the amount of end

clearance indicated, for viscosity’s between 7500 and

25,000 SSU (e g , resins) triple the amount indicated
For specific recommendations for end clearances for

viscosity or for operating temperatures above 225ºF,

check with your Viking Representative or consult the

factory

6. Coat the idler pin with a suitable lubricant and place the

idler on the idler pin in the head

7. The head can now be assembled on the pump Tilt the

top of the pump head away from the pump slightly until

the crescent enters the inside diameter of the rotor and

rotate the idler until its teeth mesh with the rotor teeth

Pump head and casing should have been marked before

disassembly to insure proper reassembly If not, be sure

idler pin, which is offset in the pump head, is positioned

toward and an equal distance from port connections to

allow for proper flow of liquid through the pump

8. Install relief valve if provided and removed Valve cap

should point to Suction side of the pump

(See Figure 3

on page 2).

9. Place key and external retaining ring onto shaft then

follow instruction listed for assembling to the coupling

5. If old gaskets are not reusable, refer to “Adjusting

Head Gasket End Clearance” on page 10. Otherwise,

place the head gaskets on the head The proper amount

of gaskets should be used to provide the correct end

clearance

Table 2 gives the quantity of gaskets available

in a gasket set along with standard end clearance

End clearances are adequate for viscosity’s up to 750 SSU

(SAE 20-lube oil at room temperature) Higher viscosity

liquids require additional end clearances

4. Clean rotor and shaft so it is free of dirt, grit and other

debris and apply lubricant Push into casing and bracket

bushings as far as it will go

STANDARD POSITION

CW ROTATION AS

VIEWED FROM HEAD

DISCHARGE

PORT

GROOVE

SUCTION

PORT

Advertising