Great Plains 3000-3S Assembly Instructions User Manual

Page 4

Advertising
background image

195-192M Rev. A

2/16/2005

Great Plains Mfg., Inc.

Point-Row Option 2004-

4

Refer to Figure 6

6.

Assemble new 21" hoses (12) to top-front
ports on new pressure control valves. Using
tee fittings (13), assemble new 18" hoses (14)
and 86" hoses (15) to bottom ports. Using
adaptor fittings (16), assemble remaining 86"
hoses (17) to rear ports.

7.

Route 86" hoses (15 and 17) from new pres-
sure control valves back to drill frame.

8.

Connect hoses to new block. Connect 21"
hoses to lower-front ports in block. Connect
18" hoses to top-front ports in block. Connect
hoses to block in same order as valves. (For
example, connect hoses from center valve to
center ports in block.)

17087

Figure 6

Hoses

Advertising