EFCO 8800 Series Assembly Instructions Vol.5 User Manual

Page 14

Advertising
background image

EFCO 2009

Page 14

Series 8700 / 8800 Unitized Curtain Wall Assembly Instructions - Volume 5

2. Using an approved solvent or cleaner, clean the sealant contact surfaces of the jamb adapters and mullions of all oils and other contaminants.
3. Apply sealant to the contact surfaces at the intersection of the concealed vent horizontals and the vertical mullions where the jamb adapter abuts into the

horizontals (4 locations). See Figures 12 and 13 on page 15.

4. Apply sealant to each end of the concealed vent jamb adapters. See Figures 14 and 15 on page 15.

Section 19 - Frame Assembly - Vent at Stack Sill

Figure 11

17L5 Concealed Vent

Jamb Adapter

17L5 Concealed Vent

Jamb Adapter

Apply sealant at the intersection of the
concealed vent horizontals and the verticals
where the ends of the jamb adapter will abut.
(See Figures 12 and 13 on page 16).

Apply sealant to each end of

the jamb adapters. (See

Figures 14 and 15 on page 16).

Concealed Vent

opening

HEAD

SILL

Advertising
This manual is related to the following products: