EFCO 8800 Series Assembly Instructions Vol.5 User Manual
Page 38
EFCO 2009
Page 38
Series 8700 / 8800 Unitized Curtain Wall Assembly Instructions - Volume 5
Section 24 - Captured Vent Unit Glazing at Fixed Horizontal : B. Setting and Caulking Glazing
Figure 60
3. Remove the temporary glazing retainers.
4. Apply structural silicone sealant into the voids between the glass and mullions per the sealant manufacturer’s application instructions. Frames should not be
moved until the sealant has cured and per the sealant manufacturer’s recommendations.
5. Refer to Volume 2, page 21 and 22 of the S-8000 Unitized Curtain Wall Assembly Instructions for glazing instructions, details and notes.
Note:
Only silicone sealants which
have been developed and tested
specifically for structural
glazing applications should be
used for glazing purposes.
Apply Structural
silicone.
Pack sealant
into joints.
HEAD
SILL
Apply structural silicone
sealant into the voids between
the glass and mullions.
Apply structural silicone
sealant into the voids between
the glass and mullions.
Concealed Vent
opening