Smart Power Systems HR-12 50 Hz User Manual

Page 29

Advertising
background image

Smart Power

®

Systems

A. C. MODULAR GENERATOR SYSTEM

Page 28 of 54


11.

Prior to applying full load, and after the oil temperature is above 100°F verify proper
operation of the cooler fan by feeling for airflow being pushed out of the tray
assembly. If the air is not being pushed through the cooler face contact Smart
Power

®

Systems at (231) 832-5525 for more information. Also verify that the air

passing through the cooler and the fan is not restricted.

WARNING:


The SPS Model HR-12/HR-15 have been pre-set at the factory to provide correct
frequency and voltage. No pump adjustment is required. If it appears the pump
needs to be adjusted, contact Smart Power

®

Systems at (231) 832-5525 before

proceeding. Damage to generator from improper pump adjustment will void the
system’s warranty.

Improper ventilation will result in system overheating, reduced performance and
possible damage to the system and/or cause personal injury. If the system is
installed such that improper ventilation exists, the system’s warranty will be voided.

12.

Set “auto-start” option.

If the auto-start option is enabled, the generator will begin generating electricity
whenever the PTO is engaged. If the auto-start option is disabled, the generator
will not output electricity after PTO engagement until the “on/off” switch is pressed.
Select the auto-start function by performing the following steps:











Advertising
This manual is related to the following products: