4 check components, Parts list – Jaypro Sports FBGP-920AX User Manual

Page 3

Advertising
background image

WWW.JAYPRO.COM

P a g e

3 11/1/13

 Mechanic’s tool set
 Wrench Set
 Level, 3’ minimum
 100-foot tape measure
 Electric Drill
 Drill Bits:

o

5/16“, 1/2", and 5/8” bits

 Rubber mallet

The following equipment is optional, but strongly recommended:


 17/32”, 21/32”, and 11/16” transfer punches (highly recommended)
 3/16”, 3/8” drill bits to pilot holes (highly recommended)
 Heavy grease or white lithium grease
 Antiseize Lubricant
 Baling wire (if using rebar)
 (6), 54-inch lengths of 5/8-inch rebar

4 Check Components

Goal posts are sold in pairs. Inspect your goal post shipment and ensure you received
these parts:

Parts List

2 Goosenecks
2 Anchor Kits
2 Crossbars
4 Twenty foot uprights
4 Upright end fittings
4 Wind socks
Yellow spray paint

Check to confirm that your Goal Post has shipped with all hardware. If any hardware
or components are missing, contact the Jaypro Sports customer support team, Monday
through Friday, 8:00 A.M. to 5:00 P.M. Eastern Time at 1–800–243–0533 for
replacements.



Advertising
This manual is related to the following products: