4 installation procedure, 1 sprayer inspection, 2 boom speed test – NORAC UC4+BC+HD1 User Manual

Page 10

Advertising
background image

7

4

INSTALLATION PROCEDURE

4.1 S

PRAYER INSPECTION

It is necessary to check the existing
system’s functionality before installing the
UC4+ Spray Height Control system.

1. Drive your sprayer onto a flat piece of

land, with unobstructed boom
movement (e.g. no power lines).

2. Ensure the boom guide-rods are set to

the “tapered” position (factory setting)

3. Set boom suspension to be critically

damped (Figure 5). Adjust the boom
damper accordingly.

a) Push boom tip down approximately

75 cm (30 inches).

b) Hold the boom steady for a

moment, and release.

c) Ensure the boom returns to its

relaxed state as quickly as possible,
with little to no overshoot.

Figure 5:Boom Push Test- Critically

Damped

4. Inspect slide pads for excessive wear

5. Test that all boom functions operate

correctly. As you test each function
check it off in Table 3.

It is necessary to test the boom

functions in all directions

Table 3: Hydraulic System Function

Check Sheet

BOOM

FOLD

IN

FOLD

OUT

UP

DOWN

LEFT
MAIN
RIGHT
ROLL*

N/A

N/A

*

Some sprayers may not have this function.

4.2 B

OOM

S

PEED

T

EST

IMPORTANT:

Raise/lower all boom sections several
times to warm up the hydraulic
system. Grease all moving parts for
consistent results.

1. Lower each boom and main section as

close to the ground as possible.

2. Set your sprayer at field working RPM

on the throttle and mark this value in
Table 4.

You will need a stopwatch or a

watch that displays “seconds” for
the next step.

3. Raise the LEFT boom from its extreme

LOW position to the very TOP of its
travel. Record the time this takes in
Table 4, “Trial #1” for “Left UP”.

Advertising