7 electrical installation – NORAC UC4+BC+HD1 User Manual

Page 23

Advertising
background image

20

4.7 E

LECTRICAL

I

NSTALLATION

1. Install the UC4+ Control Panel (E01) in

the cab of the sprayer. Mount the panel
where it will be clearly visible and within
easy reach of the operator.

A good spot to mount the UC4+
control panel is on the right hand side
of the cab to the Roll Over Protection

Bar (ROP). Four pilot holes for the
screws provided need to be drilled to
facilitate the control panel mounting.

Another option is to purchase an
adapter for the flexible panel mount that
has a 3/8" NC threaded stud on the end
to bolt through an existing mount. You
can find these at your local outdoor
store as a RAM mount part number
RAM-B-236. (See

http://www.ram-

mount.com/

)

Figure 24: Control Panel Mounting

Figure 25: Cable Configurations: C10, C06, C01 and C04

ROP

Advertising