2 valve block mounting – NORAC UC5-BC-FT02A User Manual

Page 23

Advertising
background image



20

Figure 17: NORAC Valve Block Details


9.2

Valve Block Mounting

1. Mount the valve block on the center section of the boom as illustrated in Figure 18.

2. Insert the threaded rod into the block and use a hex nut to hold the rod. The block holes

are 3/8” NC-1” deep. If bolts are used instead of the threaded rod, ensure the bolts thread
in at least 3/8”.

3. Use the remaining hardware to secure the block to the sprayer.

4. Cut off excess threaded rod, if necessary.

Figure 18: Valve Block Mounting

Advertising