VACUUBRAND MZ 2C EX +IK+EK User Manual

Page 42

Advertising
background image

page 42 of 75

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check carefully

the validity of this document with respect to his product. manual-no.: 999128 / 29/04/2014

Attention: Perform a leak test always after opening the pump by

using an appropriate leak detector (e. g. helium leak detector)!

Ensure that the diaphragm clamping disc never hits the head

cover while pump is running! Noise check!

If the pump does not achieve the ultimate pressure:

In case the diaphragms and valves have been replaced, a run-in period of several

hours is required before the pump achieves its ultimate vacuum.

If all pump heads achieve a vacuum below 120 mbar but pump does not achieve the

ultimate total pressure:

Check hose connectors between pump heads and manifolds for leaks. If necessary

recheck pump chamber.

Advertising
This manual is related to the following products: