VACUUBRAND CVC 3000 detect User Manual

Page 43

Advertising
background image

page 43 of 74

Example 2:

Vacuum pump with in-line

valve and/or Vacuum-Man-

agement-System Module A:

Pumping down with interme-

diate venting

Program step 1 should be always a definite initial state, here atmospheric

pressure (ATM). To reach this state definitely, set a tickmark at ”Vent.”

and ”Step” by pressing the selection knob.

In step 2, pumping down begins, reaching 10 Torr/mbar within 5 minutes

(linear ramp), as ”Step” is not set.

Step 3: Vacuum holds there for 15 minutes.

Step 4: Vents to 500 Torr/mbar within 1 minute.

Step 5: Holds 500 Torr/mbar for 9 minutes.

Step 6: Pumping down, reaching 5 Torr/mbar within 10 minutes (linear

ramp), as ”Step” is not set.

Step 7: Vacuum holds there for 20 minutes.

Step 8 vents to atmospheric pressure as fast as possible and switches off

the control after one minute.

Program

No hh:mm:ss Vac Vent. Step det.

01 00:00:00 ATM ✔ ✔

02 00:05:00 10

03 00:15:00 10

04 00:01:00 500 ✔

05 00:09:00 500 ✔

06 00:10:00 5

07 00:20:00 5

08 00:01:00 ATM ✔ ✔

09 00:00:00

10 00:00:00

- - - - - - - - - - - - - Back - - - - - - - - - - - - - -

01:01:00

sure unit) and 20 Torr/mbar/hPa. The determined boiling vacuum is used

in the ”Vac Control” function as ”Set vacuum”. In case no boiling vacuum

is detected, the controller controls to 20 Torr/mbar/hPa. The following

step starts once the cumulative process time reaches the set limit (1

hour/60 minutes), even if the preset pressure (20 Torr/mbar/hPa) has not

been reached.

Step 4 vents to atmospheric pressure as fast as possible and switches off

the control after one minute.

Advertising