Carrier 48GH User Manual
Combination heating/cooling units
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
Number One
----------------------- i
AirConditbninq
1
Maker
Division of
Carrier Corporation
Carrier Parkway • Syracuse NY 13221
Combination Heating/Cooling Units
NOTE TO INSTALLER: THESE INSTRUCTIONS SHOULD BE
LEFT WITH THE EQUIPMENT OWNER.
INDEX
Page
GENERAL ........................................................ 2
INSTALLATION................................................ 2-8
• Rigging and Unit Placement .....................2-3
ROOFTOP INSTALLATION
GROUND LEVEL INSTALLATION
CLEARANCES
• Condensate Disposal .................................. 3
• Venting ..........................................................4
• Typical Piping .............................................. 5
Page
• Duct Connections...............................................
5
• Typical Wiring Connections............................
HIGH-VOLTAGE CONNECTIONS
SPECIAL PROCEDURES FOR
208-V OPERATION
LOW-VOLTAGE CONNECTIONS
HEAT ANTICIPATOR SETTING
START-UP...............................................................
OPERATING SEQUENCE....................................
SERVICE................................................................
TROUBLESHOOTING CHARTS ..........................
21-22
VENT CAP
COMBUSTION AIR INLET BOX
G HIGH VOLTAGE INLET
NOT ON MODELS 48GLOI8 THRU
036; GH024 THRU 030
k
FPT GAS
INLET
NOT ON MODELS
48GL0I8 THRU 036;
GH024 THRU 030
48GH,GL REQUIRED CLEARANCES (ft-in.)
Above flue vent .
.
.
.
.
.
. 3-0
Duct side of unit
0-6
Side opposite ducts
.
2-6
Blower access panel side
2-6
Side opposite blower access panel .
2-6
Bottom of unit
.
.0
NOTE Provision must be made for fresh ambient air to reach the
outdoor coil without recirculation of the air from the outdoor fan
discharge
Fig. 1 — Dimensions
©
Carrier Corporation 1981
Form 48GH.GL-1SI
Document Outline
- Combination Heating/Cooling Units
- SAFETY CONSIDERATIONS
- INTRODUCTION
- ÍMPORTANT —
- READ BEFORE IMSTAiliNO
- GENERAL
- INSTALLATION Rigging and Unit Placement
- Condensate Disposal
- stallation Data
- Typical Wiring Connections
- Fig. 7 — High- and Low-Voltage Connections
- START-UP
- Unit Preparation
- Heating Section Start-Up and Adjustments
- Cooling Section Start-Up and Adjustments
- Refrigerant (R-22) Charge Check Charts
- OPERATING SEQUENCE
- SERVICE
- Note to Equipment Owner: Consult your local dealer about the availability of a maintenance contract.
- Top Removal
- Air Filter
- Condenser Fan
- SYMPTOM
- TROUBLESHOOTING CHARTS Table 7 — Heating Service Analysis Chart
- REMEDY
- SYMPTOM
- Table 8 — Cooling Service Analysis Chart
- CAUSE
- REMEDY