Top frame assembly – Deltech Fitness DF4900L- Linear Bearing Smith Machine with Lat Attachment User Manual

Page 18

Advertising
background image

INSTALL THE 3-1/2” PULLEYS (P) INTO THE TOP FRAME (A) USING THE
PULLEY BUSHINGS (Q), THE M12 x 65MM BOLTS (T), AND THE M12 LOCK
NUTS (V).

NOW INSERT THE 2” x 3” CAP (J) INTO THE END OF THE TOP FRAME (A).

O

L

A

V

Q

Q

T

P

TOP FRAME ASSEMBLY

(NOTE: THE NUTS USED ON THIS ARE
LOCKNUTS, THIS MEANS YOU MUST
TIGHTEN THEM DOWN PAST THE
PLASTIC INSERT.)

Advertising