Cable installation – Deltech Fitness DF4900L- Linear Bearing Smith Machine with Lat Attachment User Manual

Page 21

Advertising
background image

NOTE: BOTH CABLES ARE THE
SAME LENGTH

THE CHAIN ATTACHES TO THE
BOTTOM CABLE BETWEEN THE
CABLE AND THE ROW BAR.

WARNING: THE BAR CATCH IS
MEANT FOR HOLDING THE BAR
ONLY, NOT FOR BODY WEIGHT

CABLE INSTALLATION

STARTING WITH THE CABLE END WITHOUT THE BALL, INSTALL UPPER CABLE OVER
FRONT PULLEY, BACK TO MIDDLE PULLEY, DOWN TO TOP PULLEY OF FLOATING PULLEY
ASSEMBLY, UP TO REAR PULLEY AND DOWN TO WEIGHT CARRIAGE. ATTACH SNAP HOOK
TO END OF CABLE AND THEN TO WEIGHT CARRIAGE BRACKET. ATTACH SNAP HOOK TO
BALL END OF CABLE AND ATTACH LAT BAR.

STARTING WITH THE CABLE END WITHOUT THE BALL, INSTALL LOWER CABLE UNDER
FRONT PULLEY, BACK TO REAR PULLEY AND UP AND OVER LOWER PULLEY OF FLOATING
PULLEY ASSEMBLY. ATTACH SNAP HOOK TO END OF CABLE AND THEN TO FRAME POLE
BRACKET. ATTACH SNAP HOOK TO BALL END OF CABLE AND ATTACH 10” CHAIN. ATTACH
SNAP HOOK AND ROW BAR.

Advertising