Ton log splitter, w2700 – EarthQuake W2700B User Manual

Page 10

Advertising
background image

Operator's Manual

27-Ton Log Splitter, W2700

Check for parts online at

www.getearthquake.com or call 800-345-6007 M-F 8-5 CST

Operator's Manual

27-Ton Log Splitter, W2700

Check for parts online at

www.getearthquake.com or call 800-345-6007 M-F 8-5 CST

10

11. Slide the splitting wedge on the beam all the way to the

end of the beam against the splitting foot. Stand the beam

vertically on its splitting foot so the splitting wedge is point-

ing downward. Back the trailer assembly into the beam so

that the pivot pin holes on the beam and trailer assembly

are aligned with one another. SEE FIGURE 7. The spring

loaded lock pin that is on the tongue, underneath the pivot

pin hole, will need to be pulled back to allow the pivot pin

holes to line up. SEE FIGURE 8. Insert the large clevis pin

through the aligned pivot pin holes on both the tongue and

beam, and secure in place with the corresponding hair pin.

SEE FIGURE 8.

12. With the beam still in the vertical position, place the cylin-

der/valve assembly onto the beam’s cylinder mount plate

and attach using the four nuts, four lock washers, and four

flat washers that are found in parts bag labeled #2. SEE FIG-

URE 9. Tighten with a 25mm deep-pocket socket wrench, (a

socket extension will be needed to reach the nuts).

note: Before mounting the cylinder/valve assembly to the

beam, make sure the trailer and beam assemblies are on

a flat and level surface, and the beam is securely locked to

the trailer assembly via the pivot pin and vertical lock pin.

Figure 7

Figure 8

Figure 9

clevis pivot pin

vertical lock pin

beam

pull

trailer assembly

pivot pin holes

cylinder/valve

assembly

beam

cylinder mount

plate

View of

mount plate

Advertising