Fig. 11.11, Fig. 11.12 – EZ-ACCESS PASSPOR User Manual
Page 41
Page | 41
FIG. 11.11
FIG. 11.12
12. Remove 1/4
” nut & bolt attaching purple ground wire to upper left gusset on carriage. Slide 1/4” ring
terminal on other end of 16” black wire over bolt and reassemble so both purple and black wires are
grounded to carriage. (FIG. 11.11).
13. Secure the added wires to existing wires with the zip ties provided. Cut excess material from zip ties as
needed. (FIG. 11.12)
14. Reinstall the front and rear cover panels on lift tower.
15. Reinstall the rear platform guard wall.
16. F
ollow the Porta Electric EMDL 06 Door Interlock manufacturer’s instructions for the mounting and use
of the Interlock on an existing door.
17. Reattach the white 10 gauge ground wire to negative battery terminal.
18. Reinstall the plastic cover on power head.
19. Plug in AC power cord and turn the VPL Keyed Power Switch to the
“ON” position.
TEST EXTERIOR DOOR INTERLOCK:
20. With door closed, operate lift through entire range of travel up and down. The door interlock mechanism
should only unlatch and allow door to open when lift platform is within
3” of threshold. The door must
also be closed and interlock latched for platform to descend more than
3” from the threshold.
Once
modified to operate with an Interlock, the VPL will not operate correctly while
electrically connected to the Top Landing Gate.