Installation, Connection diagram – DNF Controls CP20 User Manual

Page 8

Advertising
background image

Flex Control Network

®

, CP20 User Manual

Page 4 of 42

1. Installation

CAUTION
Do NOT apply AC voltage to the power supply, before connecting the power supply to
CP20 CONTROL PANEL. Component damage may occur.

1) Connect a Cat 5 cable to CP20 CONTROL PANEL connector labeled “E-NET #1”.

Connect other end of the Cat 5 cable to customer supplied Ethernet hub.

2) Connect power supply DB9 female connector to the CP20 CONTROL PANEL

connector labeled “POWER“.

3) Connect female side of AC power cable to the supplied power supply.
4) Connect male side of AC power cable to 100 – 240VAC.
5) Push the CONTROL PANEL power switch, located on rear panel, to ON position.

“O” on the power switch is the OFF position.

6) When power up and system initialization completes, the front panel display will

show Model Number and Software Version. Allow 25 seconds for power up and
system initialization to complete.

7) OPTIONAL: Connect PC Keyboard to CP20 CONTROL PANEL connector labeled

“Keyboard”

8) OPTIONAL: Connect ST420 Shotbox to CP20 CONTROL PANEL connector labeled

“RS-232 Port” using the supplied RS232 cable. Use the top connector.

CAUTION
Do NOT apply AC voltage to power supply, then hot plug the power supply to the
CP20 CONTROL PANEL. Component damage may occur.

Connection Diagram

Advertising