SMA Communit-10 User Manual

Page 24

Advertising
background image

6  Electrical Connection

SMA Solar Technology AG

24

Communit-IA-A1-en-22

Installation Manual

Procedure:

1. If necessary, remove the Communit door.
2. Remove the filler plug from the cable gland.
3. Remove the rubber seal from the cable gland.
4. Adjust the rubber seal to the diameter of the cable to be inserted:

• Remove the appropriate number of sealing rings from the

rubber seal.

5. Lead the cable through the swivel nut of the cable gland. Ensure that the thread of the swivel nut is facing upwards.
6. Insert the cable above the swivel nut sideways into the rubber seal.

7. Insert the rubber seal with the cable in the cable gland.
8. Cut the cable to length.
9. Tighten the cable gland.

6.3 Connecting the Cables to the Connecting Terminal Plates

6.3.1 Connecting Conductors to the Spring-Cage Terminal

Connect each conductor to the corresponding spring-cage terminal as follows.

Procedure:

1. Insert the screwdriver into the clamping contact of the spring-cage

terminal.

Cable diameter

Number of sealing rings to be removed

4.5 mm to 5.0 mm

0

4.5 mm to 7.5 mm

1

7.0 mm to 10.0 mm

2

9.5 mm to 13.0 mm

3

Connecting terminal plate

Screwdriver size

X300, X460

3.5 x 0.5

X500 to X530

2.5 x 0.4

Advertising