Vertical direct venting, Vertical termination – optional concentric vent – Lochinvar KNIGHT WH 55 - 399 User Manual

Page 30

Advertising
background image

30

Installation & Operation Manual

5

Vertical direct venting

Vertical termination – optional concentric vent

Figure 5-6 Concentric Vent Roof Installation

Ensure termination height is above the
roof surface or anticipated snow level (12
inches in U.S.A. or 18 inches in Canada) as
shown in FIG. 5-4, page 29.

If assembly is too short to meet height
requirement, the two (2) pipes supplied
in the kit may be replaced by using the
same diameter, field supplied SDR-26 PVC
(D2241) pipe. Add standard schedule 40
PVC pipe for #CVK3007 Do not extend
dimension D more than 60 inches (see FIG.
4-9 and FIG. 4-10, page 25).

CAUTION

DO NOT use field-supplied couplings to
extend pipes. Airflow restriction will occur.

6. Install the rain cap and the small diameter pipe assembly

into the roof penetration assembly. Ensure the small
diameter pipe is cemented and bottomed in the Y concentric
fitting.

7. Cement the appliance combustion air and vent pipes to

the concentric vent termination assembly. See FIG. 5-6 for
proper pipe attachment.

8. Operate the appliance through one (1) heat cycle to ensure

combustion air and vent pipes are properly connected to
the concentric vent termination connections.

Multiventing vertical terminations

When two (2) or more direct vent appliances are vented near
each other, each appliance must be individually vented (see
FIG. 5-7). NEVER common vent or breach vent this appliance.
When two (2) or more direct vent appliances are vented near
each other, two (2) vent terminations may be installed as shown
in FIG. 5-7. It is important that vent terminations be made as
shown to avoid recirculation of flue gases.

12”

MINIMUM

12” (18” FOR CANADA)

MINIMUM CLEARANCE

ABOVE HIGHEST

ANTICIPATED SNOW

LEVEL. MAXIMUM OF

24” ABOVE ROOF.

COMBUSTION
AIR (TYPICAL)

Figure 5-7 Concentric Vent and Combustion Air Vertical
Termination

Do not operate the appliance with
the rain cap removed or recirculation
of combustion products may occur.

Water may also collect inside the larger
combustion air pipe and flow to the
burner enclosure. Failure to follow this
warning could result in product damage
or improper operation, personal injury,
or death.

4. Install the Y concentric fitting pipe assembly through the

structure’s hole and field supplied roof boot/flashing.

Do not allow insulation or other materials
to accumulate inside the pipe assembly
when installing through the hole.

5. Secure the assembly to the roof structure as shown

below in FIG. 5-6 using field supplied metal strapping or
equivalent support material.

ƽ WARNING

NOTICE

NOTICE

NOTICE

Advertising