The 4-post rack assembly consists of, The 2-post rack assembly consists of, Site preparation – Polycom PDS 725-78600-002A2 User Manual

Page 15: Setup location, rack and appliance precautions

Advertising
background image

Site Preparation

Polycom Digital Signage Server Hardware Setup

Polycom, Inc.

11

Hardware Kit: screws, cone washers, and cage nuts (from left to right)

8 (Eight) M5 x 12 flat head screws
2 (Two) 10-32 x 3/4” pan head screws
22 (Twenty-two) M4 x 4 truss head screws
8 (Eight) M5 x 12 cone washers
10 (Ten) M5 Cage nuts

The 4-post rack assembly consists of:

A set of long, fixed rack brackets that attach directly to the rack itself.
A set of medium-sized adjustable rack brackets that attach to the long,

fixed rack brackets.

The 2-post rack assembly consists of:

A set of long, fixed rack brackets.
Three sets of short rack brackets that attach to the long fixed rack brackets.

One of these sets has threaded holes (for placement in the front) to allow
the appliance to be secured in the rack.

Site Preparation

Setup location, rack and appliance precautions

• Elevated Operating Ambient - If installed in a closed or multi-unit rack

assembly, the operating ambient temperature of the rack environment

may be greater than room ambient. Therefore, consideration should be

given to installing the equipment in an environment compatible with the

maximum ambient temperature (Tma) specified by the manufacturer.

NOTE: Use the hardware supplied with your specific rack if different from the
hardware supplied in this kit.

Advertising