Post rack installation – Polycom PDS 725-78600-002A2 User Manual

Page 18

Advertising
background image

Polycom Digital Signage Server Getting Started Guide

Rack Installation

14

Polycom, Inc.

Make sure the rack / rail assemblies and screws are aligned in the rack not

only in the front and back, but are level in height on the left and right sides

for proper alignment for appliance installation.

Step 3

Align the fixed chassis rails on the appliance with the fixed rack rail

brackets installed in the rack.

Carefully slide the appliance into the rack until you hear the locking tabs

on each side of the fixed front rails click into place.

Push the appliance all the way into the rack until it stops.
Sefcure the unit in the rack using a 10-32 x 3/4" truss head screw (and a

cage nut if not already installed) in the center hole on each rail.

2-Post Rack Installation

Unpack the appliance and locate the mounting hardware.

Two M5 x 12

flat head screws and

two cone washers

(rear)

Two cage nuts

(rear)

4-post rack

Three cage nuts

(front)

Two M5 x 12
flat head screws
and two cone
washers

Outer fixed chassis rails

Advertising