General installation criteria – Vector IVECO MOTOS V08 ENT M12 User Manual

Page 11

Advertising
background image

INSTALLATION DIRECTIVE

MAY 2006

11

V08 EnT M75 - M11 - M12

4. GENERAL INSTALLATION CRITERIA

Accessibility

The engine must be located in such a way as to allow filling

and draining engine liquids when doing servicing operations.

Moreover, the relay box and the diagnostic push-button

present on it must be accessible, also when underway.

Anchoring

If anchoring is accomplished by interposing shock mounts,

they must be able to support the engine’s mass and the lon-

gitudinal thrust exerted by the propeller shaft in motion.

If rigid mounting is adopted, particular care must be given to

support alignment and co-planarity.

Information on dimensions and fastening values are provided

in the “Installation Diagram”.

Combustion and ventilation air

Compliance with prescriptions on the quantity of air

required for combustion and ventilation assures a regular

operation of the engine even in adverse conditions and it

enables to deliver its maximum rated power (1).

Sea water line

It must be provided with an intake capable of preventing

the entry of foreign bodies into the suction pipes. Between

the intake and the pump, it is best to interpose a gate to be

closed in emergencies or for extended idle periods and a

filter to stop the smaller impurities; it is also recommended

to install a suitably dimensioned and easily replaced zinc

anode.

The engine sea water line was provided by the manufacturer

with protection anodes to be replaced periodically.

The rubber hoses positioned along the pipeline shall be suffi-

ciently rigid not to create choked areas caused by crushing (1).

Engine pre-heating

If the engine usage profile requires immediate delivery of

power at the highest rpm’s, it is recommended to install an

auxiliary pre-heater on the closed cooling loop.

Exhaust gas outlet

The exhaust gas outlet conduits shall be compliant with the

guidelines contained in the IVECO MOTORS publication

“Guide to the installation of marine engines”; it also provides

indications to compute the dimensions of the exhaust pipe-

lines, which is the Yard’s responsibility.

Electric - electronic equipment

Provide a suitable arrangement of the relay box, and of the

optional electronic unit referring to the dimensions and posi-

tion of the wire harnesses and the relative connectors.

Both units must be anchored in such a way as to dampen the

vibrations and stresses undergone by the hull while under-

way and/or induced by the engine’s operation.

NOTE: Information about optional equipment are described

in the Chapter 21.

(1) The EDC engine electronic control is programmed to

reduce maximum deliverable power if the operating

parameters measured by the sensors show that criti-

cal conditions have been reached, and if exceeded the

engine could be damaged.

Advertising
This manual is related to the following products: