Lukas Rerailing system User Manual

Page 18

Advertising
background image

18

The rerailing bridge is placed under the derailed vehicle and is packed up with wooden
beams if necessary. If the length of a single bridge is inadequate, two bridges can be bolt-
ed together with the connecting element, thus providing an extension. Here again you need
to make sure that enough packing-up is provided.
Both rolling carriages are then placed on the bridges and connected together using the two
telescopic connecting rods. It makes sense to measure the centre distance between the
lifting points beforehand so that the connecting rods can be set accordingly.
Additional trapezoidal threads are provided on one side for fi ne adjustment.
The traversing cylinder can be arranged from the outside or between the two rolling car-
riages, depending on the space available.

Once the traversing technology has been introduced in accordance with the safety instruc-
tions, the preselection valve is moved to the right.
The load of the vehicle is transferred by extending the cylinders HP 10 / T280R.

Advertising