Leica Geosystems GPS System 500 Equipment - User Manual User Manual

Page 17

Advertising
background image

17

GPS Equipment User Manual - 4.0.0en

Getting started with the new Survey equipment

Measuring with the default configuration, continued

Use the cursor up or cursor down key
to highlight the input field for jobs.
Then press ENTER. The following
listbox will appear:

Now press F2 NEW. The following
panel appears:

Now use the cursor up or cursor
down key on the terminal to highlight
the PP_STAT line. Then press
ENTER or F1 CONT.

Jobs are used to organise and
structure the data you collect in the
field. Jobs can comprise an unlimited
number of points together with all
related information (raw measure-
ments, codes, point annotation, etc.).

It is recommended that a new job is
created whenever a new project is
started.

Upon formatting the memory device
(i.e. PC-card or internal memory) a
default job is automatically created.
You can either use this job straight
away or you can create your own job
by doing the following:

Advertising