Leica Geosystems GPS System 500 Equipment - User Manual User Manual

Page 22

Advertising
background image

22

GPS Equipment User Manual - 4.0.0en

Getting started with the new Survey equipment

Measuring with the default configuration, continued

The screen is altered as follows:

The STORE key has become active,
and you still have the chance to
check and correct the entered point
id and the antenna height.

Conclude the survey sequence by
again pressing F1 STORE.

After pressing the STORE key all
related information will be stored in
the currently used job (point id,
antenna heights, etc.)

Step 6: Ending a Survey

You can now quit the survey opera-
tion panel by pressing SHIFT F6
QUIT
. This brings you back to the
main menu.

Pressing SHIFT F6 will
always allow you to termi-
nate the survey operation,

even during a site occupation. In this
case you will lose all data collected
since pressing OCUPY.

As soon as you are back to the main
menu the PC-card may be removed.
This is indicated by the PC-card icon
in the status line which contains an
arrow:

You can now switch off the receiver.
Once power is off disconnect all
cables and put all equipment back
into the shipping case.

Datalogging should continue depend-
ing on your observation plan: a
receiver used as reference has to run
permanently until all rover site occu-
pations are completed. If a unit is
operated as a roving receiver the site
occupation time depends mainly on
the baseline length and your accu-
racy requirements. See General
Guide to Static and Rapid Static
for
details.

Once a sufficient amount of raw data
has been collected the survey of the
point can be completed by pressing
F1 STOP.

Advertising