Charge cooler installation, cont’d – Vortech 2003-2005 Lexus 3.0L IS300 User Manual
Page 19
Advertising
P/N: 4LA020-010
©2007 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
11JUL07 v1.1 Lexus(4LAv1.1)
11
6.
CHARGE COOLER INSTALLATION, cont’d
Fig. 6-e
Fig. 6-f
Fig. 6-d
TUBE “B”
TUBE “C”
Ø2.5" x 25°
SLEEVE
Ø4.5" HOLE IN
SPLASH PANEL
Ø2.5" x 25°
SLEEVE
CAC
CAC
TUBE “C”
Ø2.5 x 25°
SLEEVE
E.
Attach Tube “B” using a Ø2.5" x 25° sleeve
and #40 clamps provided to Tube “A” as
shown. (See Fig. 6-d.)
F.
A Ø4.5" hole will need to be cut in the driver’s
side splash panel to provide a path for the
CAC discharge tube. Using a Ø4.5" hole saw
or tool of choice, mark and drill the hole loca-
tion shown. (See Fig. 6-e.)
Ø2.5" x 25° SLEEVE
TUBE “B”
OIL PAN
Advertising