Mht / hst heater assembly instructions – Enerco HST45 User Manual

Page 11

Advertising
background image

11

Operating Instructions and Owner’s Manual

| Gas-Fired Low-Intensity Infrared Heater

MHT / HST HEATER ASSEMBLY INSTRUCTIONS

1. Place gaskets from Gasket kit (02885) on each side of the burner

box. Use the four mounting studs around each of the three-inch
holes for location.

2. Slide the tube flanges over the studs as was done in the prior

step with the gaskets. The tube ends extend through the flanges
to help with alignment.

3. Using the four long and four short nuts from the bolt kit (02876)

secure the tube set to the burner box. As shown in the diagram,
use the four long nuts in the center and the four short nuts on
the outside.

4. Slide the bulkhead and reflector assembly forward until it stops

on the long nuts. Using the (4) 5/16-18 X 1/2" long screws form
the (02876) bolt kit secure the bulkhead to the burner box.

USE CAUTION AS NOT TO

OVERTIGHTEN ASSEMBLY AS IT

MAY CAUSE DAMAGE TO PARTS

OF ASSEMBLY

Enerco Group, Inc.,

Advertising