Gateway 955 User Manual

Page 89

Advertising
background image

83

Replacing the front panel board

www.gateway.com

5

Insert the new front panel board so the light pipes align with their
corresponding holes in the front panel.

6

Install the thumbscrew to secure the board to the server, then reconnect
the cables.

7

Follow the instructions in

“Closing the server case” on page 48

.

Warning

Forcing the board into place without carefully guiding the
light pipes into their holes will damage the light pipes.

Light pipes

Advertising