Service & maintenance – annual start-up

(cont.)

10b

Inspect . . .

Boiler heating surfaces

1. Disconnect the vent pipe at the boiler draft hood

and remove draft hood after turning off power to
the boiler.

. Use a bright light to inspect the boiler flue collector

and heating surfaces.

3. If the vent pipe or boiler interior surfaces show

evidence of soot, follow

Cleaning boiler heating

surfaces

in this manual section. Remove the flue

collector and clean the boiler if necessary after closer
inspection of boiler heating surfaces.

4. If there is evidence of rusty scale deposits on boiler

surfaces, check the water piping and control system
to make sure the boiler return water temperature is
properly maintained (per this manual).

5. Reconnect vent and draft hood. Replace all boiler

components before returning to service.

. Check inside and around boiler for evidence of any

leaks from the boiler. If found, locate source of leaks
and repair.Burners and base

The boiler contains ceramic

fiber and fiberglass materials.
Use care when handling these
materials per instructions on

page 68

of this manual. Fail-

ure to comply could result in
severe personal injury.

If insulation is damaged or

displaced, do not operate the

boiler. Replace or reposition

insulation as necessary. Failure

to replace damaged insulation

can result in a fire hazard,

causing severe personal injury,

death or substantial property

damage.

1. After turning off power to the boiler, remove the

jacket door and base access panel (

Figure 32

, item

4

,

page ).

. Inspect burners and all other components in the

boiler base.

3. If burners must be cleaned, raise rear of each

burner to release from support slot, slide forward
and remove. Then brush and vacuum the burners
thoroughly, making sure all ports are free of debris.
Carefully replace all burners, making sure burner
with pilot bracket is replaced in its original position
and all burners are upright (ports up).

4. Inspect the base insulation.

a. Pay attention to the

WARNINGS

on page 8

regarding working with insulation materials.

b. Verify that the insulation is intact and secure

against all four sides of the base.

Service . . .

Oiled-bearing circulators

1. The circulator shipped with the CGa boiler is water-

lubricated. No oiling is required.

. Check other circulators in the system. Oil any

circulators requiring oil, following circulator man-
ufacturer’s instructions. Over-oiling will damage the
circulator.

Start-up . . .

1. Perform all start-up procedures given in Section

6

of this manual.

. Verify

cold fill pressure

is correct and that fill

system is working properly.

3. Verify

antifreeze level

(if used) is at the right con-

centration and that inhibitor level is correct.

4.

Check gas piping

, per manual Sections

4

and

6

,

verifying no indications of leakage and all piping
and connections are in good condition.

5. Read the

Lighting or Operating instructions

(manual Section

8 or 9

) applying to the boiler.

. Start the boiler following appropriate

Lighting or

Operating instructions

(manual Section