Installing the baffle, Installing the fan shelf, Figure 13 installing a baffle – GE Industrial Solutions CPS3200U User Manual
Page 22: Figure 14 mounting the fan shelf

CPS3200U Upstream System – 23” Product Manual
CPS3200U
CC848779826 r09 December 2013
22
Installing the Baffle
Purpose: Redirect air coming into, and objects falling down toward, the FTTN shelf. Follow the steps in the table below to
attach a baffle above the FTTN shelves for all CO or customer premise applications. The baffle has two purposes: 1)
redirect air toward the back isle so that components located below the FTTN shelves will not over heat, and 2) Keep
objects from falling into the FTTN shelf. The baffle can either be fixed at a height above the Fan Shelf to allow for three
CPS3200U Shelves or be removed and reattached every time a CPS3200U shelf is added.
Note: There are two to airflow options provided for different applications: Airflow direction optimized for CO
deployments provided by the FTTN fan shelf is downward. Airflow direction for OSP applications is bottom to top. Baffles
should be oriented to direct cold air from the aisle through the converter shelf and out the back of the rack. A filter is
available and should be utilized in high contaminant areas with proper filter maintenance.
Step
Action
1.
Install the baffle using as many fasteners as the frame will accept as shown:
Figure 13 Installing a Baffle
Installing the Fan Shelf
CPS2300U shelves require external forced air. Follow the steps to install a fan shelf below each set of 3 CPS3200U
shelves.
Step
Action
1.
Install the Fan Shelf using as many fasteners as the frame will accept:
Figure 14 Mounting the Fan Shelf