Frequency converter (without bypass ac input), Upstream and downstream: neutral not distributed, Inputs (maximum two units in parallel) – APC GALAXY 5000 User Manual

Page 19: Installation

Advertising
background image

34001813EN/AE

- Page 19

2. Installation

Frequency converter (without Bypass AC input)

Upstream and downstream: TT, TN or IT system with neutral distributed

Upstream and downstream: Neutral not distributed

Parallel configuration without external bypass cabinet and with common normal and Bypass AC

inputs (maximum two units in parallel)

The requirements for the different system earthing arrangements (SEA) are similar to those for single UPS

configurations. In the diagrams on page 17, simply replace the single UPS units between points A and B by the
following parallel configuration.

The UPS installation may be equipped with earth-leakage protection upstream on the condition that the protection

apply to:

- the normal and Bypass AC inputs
- all the parallel-connected UPSs.

Main low-

voltage
switchboard

(MLVS)

b

Load

Main low-

voltage

switchboard
(MLVS)

b

Load

The UPS installation may be equipped with earth-leakage protection upstream on the condition that the protection

apply to:

- the normal and Bypass AC inputs
- all the parallel-connected UPSs.

Normal AC

14

16

15

Normal AC

14

16

15

Normal AC

14

16

14

16

A

B

Bypass AC

15

15

Normal AC

Bypass AC

Advertising