LED state

LED

Location

Item

On

Power On/OK (green)

5

On

SAS Out port status (green)

6

Figure 6 VLS9200 Capacity Enclosure Rear Panel LED Status – Normal Operation

LED state

LED

Location

Item

Off

Voltage/Fan Fault/Service Required (amber)

Power module

1

On

Input Source Power Good (green)

2

Off

Unit Locator (white)

Expansion controller

3

Off

OK to Remove (blue)

4

On

FRU OK (green)

5

Off

Fault/Service Required (amber)

6

On

SAS In Port Status (green)

7

On

SAS Out Port Status (green)

8

Powering On the VLS System

To power on the system:
1.

Power on the two private LAN switches connected to the VLS. (VLS9000 7.5 TB and 10 TB
systems only include one LAN switch.)

2.

Power on the two private Fibre Channel switches connected to the VLS. (VLS9000 7.5 TB and
10 TB systems do not include Fibre Channel switches.)

3.

Power on all arrays in the VLS. See

“Powering on VLS Arrays” (page 91)

.

4.

Press the Power On/Standby button on all of the secondary nodes.

5.

After the secondary nodes are powering up, press the Power On/Standby button on the
primary node.

6.

Confirm that the VLS components are all functioning normally and the VLS is cabled correctly
by observing their status LEDs.

The LED status should match those shown in the following table. If it does not, a component
needs attention.