Powering on the vls system – HP 9000 Virtual Library System User Manual
Page 94
LED state
LED
Location
Item
On
Power On/OK (green)
5
On
SAS Out port status (green)
6
Figure 6 VLS9200 Capacity Enclosure Rear Panel LED Status – Normal Operation
LED state
LED
Location
Item
Off
Voltage/Fan Fault/Service Required (amber)
Power module
1
On
Input Source Power Good (green)
2
Off
Unit Locator (white)
Expansion controller
3
Off
OK to Remove (blue)
4
On
FRU OK (green)
5
Off
Fault/Service Required (amber)
6
On
SAS In Port Status (green)
7
On
SAS Out Port Status (green)
8
Powering On the VLS System
To power on the system:
1.
Power on the two private LAN switches connected to the VLS. (VLS9000 7.5 TB and 10 TB
systems only include one LAN switch.)
2.
Power on the two private Fibre Channel switches connected to the VLS. (VLS9000 7.5 TB and
10 TB systems do not include Fibre Channel switches.)
3.
Power on all arrays in the VLS. See
“Powering on VLS Arrays” (page 91)
4.
Press the Power On/Standby button on all of the secondary nodes.
5.
After the secondary nodes are powering up, press the Power On/Standby button on the
primary node.
6.
Confirm that the VLS components are all functioning normally and the VLS is cabled correctly
by observing their status LEDs.
The LED status should match those shown in the following table. If it does not, a component
needs attention.
94
Operation