Satellite MX3 Wet Lift User Manual

Instructions maxim 3000 ® wet lift installation

Advertising
background image

PN 17152 REV F 10-22-10

INSTRUCTIONS

MAXIM 3000

® WET LIFT INSTALLATION

INTRODUCTION: Satellite portable restrooms and accessories must be assembled according to approved assembly procedures.
Variations in assembly could adversely affect product life and warranty.
HARDWARE

TOOLS

*AJUSTABLE WRENCH *DRILL *1/2” DRILL BIT *3/16” DRILL BIT *7/16” OPEN END WRECH *TAPE MEASURE
*T-30 TORX BIT *T-40 TORX BIT *NEEDLE NOSE PLIERS *FLAT BLADE SCREWDRIVER

1) Place wet lift label on rear panel, centered, and 16-1/2” below the roof edge, with the top of label against the bow feature.

2) Lay unit down on its back. Remove top (4) four screws from roof at pocket locations (2 per side) using a T-30 Torx bit.

3) Place Spreader Bar across the front of the roof into the two (2) pockets with bracket toward rear of unit as shown in figure 1.
Lay Top Lift unit assembly on roof with two (2) inner cables aiming towards front of the unit, and the two (2) outer cables towards
the rear of the unit as shown in figure 1. Align three (3) lift brackets as shown in figure 2, and align one (1) lift bracket at vent pipe
as shown in figure 3.

Figure1 Figure 2 Figure 3

Advertising