Satellite MX3 Wet Lift User Manual

Page 2

Advertising
background image

PN 17152 REV F 10-22-10

4) Fasten top lift assembly with (4)
5/16”x 2.50” T-40 Torx bolts and
washers through (4) brackets attached
to ends of cables. Position the spreader
bar in front of roof. Start bolts in u-nuts
in side panels so bolt is just barely out
from barrel of u-nut. Make sure to
when fastening lift cables that two
(2) left-hand 104.25” long cables
(green colored at male end of cable)
on the front corners and two (2) right-
hand 104.25” long cables (red
colored at male end of cable) on the
rear corners.

5) Fasten lift cables to top lift assembly.
Tighten bolts using a T-40 Torx bit and
locking pliers (vice grips) on the hex
shape female end of cable. Hold female
end of cable tight up against the bottom of
barrel of the u-nut. Tighten screws making
sure they go through the lift bracket, roof,
and the barrel of the u-nut into the female
threaded end of the cable. Repeat for all 4
cables. NOTE: It is important to hold the
cable end as close to the bottom of the
barrel of the u-nut as possible while
tightening. If there is a gap you can turn
the female end of the cable up against the
bottom of the barrel by turning it with
locking needle nose pliers.

6) Drill out dimples on outside of base
runners in front (1left runner & 1 right
runner) using a 1/2” dia. Drill bit. Drill
directly on top of 1/2” hole using 3/16” drill
bit & 3/16” hole should be open into 1/2”
hole as shown below. Base PN 19015
(roto-mold).

7) Drill out dimples on outside of base
runners in rear (1 left runner & 1 right
runner) using a 1/2” dia. drill bit. Drill
directly on inside of 1/2” hole using 3/16”
drill bit & 3/16” hole should be open into
1/2” hole as shown below. Base PN
19015 (roto-mold).

8) Drill out dimples on inside of base
runners in front (1left runner & 1 right
runner) using a 1/2” dia. drill bit. Drill
directly on top of 1/2” hole using 3/16” drill
bit & 3/16” hole should be open into 1/2”
hole. Base PN 19015(roto-mold).

9) Drill out dimples on inside of base
runners in rear (1left runner & 1 right
runner) using a 1/2” dia. drill bit. Drill
directly on top of 1/2” hole using 3/16” drill
bit & 3/16” hole should be open into 1/2”
hole. Base PN 19015(roto-mold).

11) Repeat steps 6) through 9) for base
PN 17858 (3 piece).

12) Thread male end of cable through
drilled holes in runner from outside to
inside. Once cable is through runner it
should fit 3/16” holes drilled in runner.

2.12”

9.87”

7.75”

2.12”

Advertising