7 condensate drain & piping – AERCO BMK 1000 User Manual

Page 20

Advertising
background image

Benchmark 750/1000 Boiler Installation, Operation & Maintenance Manual

CHAPTER 2 – INSTALLATION

Page 20 of 192

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0082_0J

05/21/2014

Ph.: 800-526-0288

GF-130

Figure2-4: Pressure Relief Valve Location

2.7 CONDENSATE DRAIN & PIPING

The Benchmark Boiler is designed to condense water vapor from the flue products. Therefore,
the installation must have provisions for suitable condensate drainage or collection.

The condensate drain port located on the exhaust manifold (Figure 2-5) must be connected to
the condensate trap (part no. 24060) which is packed separately within the unit’s shipping
container. The condensate trap inlet and outlet connections contain tapped 3/4” NPT ports.

Figure2-5: Condensate Drain Connection Location

A sample condensate trap installation is shown in Figure 2-6. However, the actual installation
details for the trap will vary depending on the available clearances, housekeeping pad height/
dimensions and other prevailing conditions at the site. The following general guidelines must be
observed to ensure proper condensate drainage:

• The condensate trap inlet (Figure 2-6) must be level with, or lower than the exhaust

manifold drain port.

• The base of the condensate trap must be supported to ensure that it is level (horizontal).
• The trap must be removable for routine maintenance. AERCO recommends that a union

be utilized between the exhaust manifold condensate drain port and the trap inlet port.

DRAIN VALVE

PRIMARY INTLET

EXHAUST

MANIFOLD

ANALYZER

PROBE PORT

CONDENSATE DRAIN

PARTIAL REAR VIEW

PRESSURE

RELIEF VALVE

3” HOT BOILER

WATER OUTLET

P&T GAUGE
COUPLING

Advertising
This manual is related to the following products: